top of page

SEEDSPACE

Integration Drawings: Working Drawings + System Integration

A number of working drawings are to be produced for this assignment. By collaborating during the design process and using our final designs from Interior Architecture Design IV, we are to develop documents that integrated building services components and identify design demands with interior desian

proposals that were appropriate for the scale of the building.

Course

Detailing & Working Drawings

Date

August 2022

LET'S CONNECT

GET IN TOUCH

ASHLEY TEW

3000 Melbourne, Victoria.

SOCIALS

@ashleytlw

© Ashley Tew 2024

bottom of page